Every Tumi Strux project follows the same proven process — 5 phases, independent inspections, and milestone-based escrow releases. Here's exactly how your money and your build are protected.

The Tumi Strux Journey

Click any step to explore the details

Step 01
Deposit
Step 02
Build
Step 03
Inspect
Step 04
Approve
Step 05
Passport
Step 01
Deposit into Escrow
Your full construction budget is deposited into a secure, platform-managed escrow account. From this moment, your funds are locked and protected. Neither the contractor nor any third party can access them.
  • Funds deposited via bank transfer or mobile money
  • Escrow account confirmed and visible on your dashboard
  • Project timeline and phase milestones agreed with contractor
  • All parties sign the escrow agreement digitally
Your Escrow Account
Total Deposited
GHS 750,000
5 phases · GHS 150,000 each · Ready to begin

How the Escrow Works

Your funds are held securely and released in 5 equal tranches — 20% per phase — only after independent verification.

Example: GHS 750,000 Build
GHS 150K
Phase 1 ✓
GHS 150K
Phase 2 ✓
GHS 150K
Phase 3 ●
GHS 150K
Phase 4
GHS 150K
Phase 5
ReleasedGHS 300,000
In ProgressGHS 150,000
LockedGHS 300,000
Platform Fees (3%)GHS 22,500

Your money never moves without your say

When you start a project, the full build budget is deposited into a platform-managed escrow account. From that moment, every cedi is tracked and protected.

  • Funds are locked on deposit. Neither you nor the contractor can withdraw without completing the release process.
  • 20% released per phase. Only after the inspector verifies completion and you approve the report.
  • All-or-nothing per phase.No partial payments. The phase is either complete or it isn't. No ambiguity.
  • Disputes freeze funds.If there's a disagreement, escrow stays locked until the 3-level resolution process is complete.

Independent Inspections

Every phase is verified on-site by a qualified, independent inspector — never the same person twice in a row.

What happens at each inspection

  1. Contractor requests sign-off

    When a phase is complete, the contractor notifies the platform. This triggers the inspection process.

  2. Inspector assigned within 24 hours

    A qualified inspector is assigned from our rotated pool. They're never the same inspector used on the previous phase.

  3. On-site verification

    The inspector visits the site, checks every deliverable against the phase checklist, and records a narrated video walkthrough.

  4. Report uploaded to your dashboard

    Video, photos, material log, and cost verification are uploaded within 24 hours. You review from anywhere in the world.

  5. You decide

    Approve to release funds, request remediation if something's wrong, or escalate to dispute resolution.

Phase 2 Inspection Report
Passed
Ground floor columns cast to spec
First floor slab poured and cured (7 days)
Staircase structure in place
Block walls raised to beam level
Materials graded: Cement A, Blocks B+, Steel A
Cost on track: GHS 144,000 / GHS 150,000 budget
7/7 deliverables verified
Video Walkthrough
12 min · Inspector: Ama Boateng · Mar 3, 2026

The Property Passport

The most comprehensive building record in Ghana. Every material, every wire, every pipe — documented and graded.

What's inside your property passport

  • As-Built Drawings
    Full architectural and structural plans reflecting what was actually built, not just the original design.
  • Electrical & Plumbing Maps
    Circuit diagrams, wire gauges, pipe routing, valve locations. Know what's behind every wall.
  • Materials Register
    Every major material logged: brand, grade, quantity, supplier, and quality rating from our inspectors.
  • Inspection Video Library
    All 5 phase inspection videos, indexed and searchable. Visual proof of every stage of construction.
  • Maintenance Schedule
    When to service the septic, repaint exterior, check roof coating, and more. A living guide for the property.
Grade A
Adjiriganor Family Residence
East Legon Hills, Accra
A
Materials
A−
Workmanship
B+
Timeline
Build TypeTwo Storey Residential
Build Duration10.5 months
Total CostGHS 750,000
ContractorAsante Builders Ltd.
Inspections5/5 Passed
Materials Logged47 items
Video Reports5 videos (58 min total)
Photo Evidence142 photos

Frequently Asked Questions

If the inspection reveals substandard work, you have three options: request specific remediation items with a deadline, reject the phase (funds stay locked), or escalate to our 3-level dispute resolution process. The contractor doesn't get paid until the work meets the agreed standard.
All inspectors hold a minimum HND or degree in Building Technology or Civil Engineering, with at least 5 years of practical experience in Ghana. They complete our platform certification programme. Critically, we rotate inspectors — the same person never inspects consecutive phases of the same project.
Absolutely. The platform doesn't replace your involvement — it supplements it. You're free to visit at any time. The escrow and inspection system simply ensures that even if you can't visit, your interests are protected.
The platform tracks actual spend against budget in real time. If a phase is trending over budget, you're notified immediately. Any budget revision requires your explicit approval through the platform before additional funds can be allocated.
Once you approve a phase release on the platform, funds are typically disbursed to the contractor within 24 hours. Platform fees are deducted transparently from the released amount — you see the exact breakdown before approving.
You can deposit in GBP, EUR, USD, CAD, or GHS. The platform handles currency conversion at competitive rates. Contractors and suppliers are paid in GHS. You see the exact exchange rate applied before confirming any deposit.
Yes. The property passport is tied to the property, not the owner. When you list the property for sale through Tumi Strux, the passport transfers to the buyer — adding significant value and trust to the transaction.

Ready to build with full protection?

Start your project today. Your funds are secured from the moment you deposit, and every phase is independently verified before a single cedi moves.

Start Your Project